50037 Inside Cab

 She is now being utilised as a store until the refit plan is drawn up. This is start from scratch full timber fit.

20140810_122202

20140810_122158

20140810_115719

The whole cab has a new floor and has been cleaned and a coat of primer sprayed

20140810_115714

20140810_115654

20140810_115651

20140810_115645

20140810_115642

20140810_115639

After the floor was completely coated with Bitumen and all of the holes filled t was insulated and new ply floor fixed

20140803_130203

20140803_112430

The next stage involved applying timber beams to carry the floor

20140623_162004

20140623_161926

20140623_161915_1

This was the steam cleaning stage 170c water with detergent to shift many years of grease and grime ready for the now floor.

20140620_114628

20140620_114634

20140620_114606

20140620_114624

20140620_114606

20140620_114622

20140620_105516

20140620_114712

20140620_114634

20140620_114624

20140620_114622

After many hours of sweeping and vacuuming we got down to the lower steel level. 3 Wheel barrows of rust and grime.

20140620_105512

20140620_105444

20140620_105431

20140620_105425

20140620_10541120140620_105420

June 2014 As delivered and the clean up starts!!

20140613_164342

20140613_164339

20140613_164328

20140613_143802

20140613_143746

20140412_152713

20140412_152716

 

20140412_152034

20140412_152031

 

20140412_152023

20140412_152020